How the balance and the Dividend formula are calculated
New revenue is the sum of the revenue lines at the party’s high estimates: $11.55 + $3.0 + $1.0 + $6.0 + $4.0 + $3.5 billion = $29.05 billion. Every other commitment is the child top-ups’ net cost ($1.56 billion), the nuclear interest ($1.92 billion) and the fixed commitments ($10.75 billion): $14.22 billion.
The Dividend formula: (new revenue − other commitments + $3.5 billion of programs the Dividend replaces) ÷ (5,697,536 residents × 12) = $18.33 billion ÷ 68.4 million = about $268 a month. Its net cost, $14.83 billion, balances the plan exactly.
The path to $500: each lever in C$ billions ÷ 68.4 million person-months. Contracts: 154.48 TWh × $10 per MWh × 75%. Wealth Fund: $3 billion × ((1.05¹⁰ − 1) ÷ 0.05) × 5%. Poverty: 25% of $3.05 billion, the midpoint of the CCPA’s $3.0–3.1 billion in today’s dollars. Families: 100,000 × $6,415.
The disability line is the party’s $0.2 billion of benefits (30,000+ children at $6,000) scaled to $6,500 ($0.22 billion), plus $0.15 billion of supports: $0.37 billion. Host community funds are 154.92 TWh × $1 per MWh: $0.15 billion.
Nuclear interest is capacity × construction cost per GW × the province’s borrowed share × the interest rate: 19.65 GW × C$4.33 billion × 75% (after federal support) × 75% (the province’s ownership stake) × 4% is about $1.92 billion a year. The BC Power earnings line shows the province’s 75% share of the $8.0 billion net earnings: $6.0 billion.
Public-power earnings are energy sold (154.48 TWh: 131.40 to data centres and 23.08 to the grid) × the contract price, less 154.92 TWh generated × US$36.46 per MWh × 1.3978. The price at which all owners together earn $8.0 billion is ($8.0 billion + $7.90 billion) ÷ 154.48 TWh, about $102.89 per MWh. Full-cost recovery adds a 30-year, 4% repayment of C$85.2 billion ($4.92 billion a year): about $82.99 per MWh.
Data-centre electricity bills are 131.40 TWh × 4.914¢ per kWh plus 15,000,000 kVA × $12.178 × 12 months (BC Hydro Rate Schedule 1830), assuming demand in kVA equals kW.
Family income tax applies the 2026 BC brackets (5.6% to $50,363, then 7.7%) to $65,000 and subtracts the basic personal credit ($13,216 × 5.6%). Other credits are ignored.
The Land Value Tax line is total assessed value × land share × capture rate. At $2.75 trillion × 60% × 0.7% it is $11.55 billion.