Renewing Hope · Restoring Trust

The costed platform

How we would pay for our proposals

This framework sets out proposed revenue, annual spending and the amount available for the BC Dividend. It uses the party’s high estimates at full implementation, including three Bruce-sized nuclear stations. The Dividend would be limited to available funding, with no borrowing for payments.

See how it adds up

Where BC starts

BC’s starting budget

BC Budget 2026, fiscal 2026/27. C$ billions.

Revenue
$85.5 billion
Spending
$98.8 billion
Deficit
$13.3 billion
Taxpayer-supported debt
$142.9 billion

The party’s framework adds new revenue and new commitments on top of this budget. It does not include a plan for the existing deficit.

The plan at full implementation

Revenue, commitments and the Dividend

Party’s high estimates, years 5–7, C$ billions a year.

New revenue$29.05 billion
Every other commitment$14.22 billion
Left for the Dividend$14.83 billion

The Dividend formula pays every other commitment first and shares what remains equally among all 5.7 million British Columbians, whatever their age. At full implementation that is $268 a month per person, or $3,216 a year: $18.33 billion in payments, or $14.83 billion net of the $3.5 billion of programs it replaces. Child and disability top-ups are paid on top.

Our target is $500 a month. The formula raises the Dividend automatically as revenue grows. See the path to $500

Proposed revenue sources

Total new revenue$29.05 billion

Proposed spending

Total platform cost$29.05 billion

Figures are rounded, so lines may not add exactly to the totals.

The Dividend formula

What reaching $500 would require

C$ a month per person. Additional revenue in C$ billions a year.

Reaching $500 a month for every British Columbian takes about $15.86 billion a year more than the plan raises at full implementation. That money is not included in the main totals. The formula would increase payments as additional revenue becomes available.

  • Better power contracts. Every 1¢ per kWh on 154.5 TWh of contracted sales adds $1.16 billion a year to the province’s 75% share.
  • The BC Power Wealth Fund. Resource and power revenue above the budget forecast goes into the Fund. $3 billion a year at a 5% real return grows to about $37.7 billion in 10 years and earns about $1.89 billion a year for the Dividend.
  • Less poverty, lower costs. Poverty costs BC’s government about $3.05 billion a year. Saving a quarter of that is $0.76 billion.
  • More working families. 100,000 two-earner families pay about $0.64 billion a year in provincial income tax.

Together they lift the Dividend to about $333 a month. The remaining $11.41 billion a year would require further revenue growth, measured before it is paid out.

From the formula to the target

$1 billion a year is about $15 a month for each of 5.7 million British Columbians. These additional revenue estimates are calculated from the sources below; none is included in the totals above.

Nuclear power for the AI build-out

The nuclear power proposal

Ontario’s Bruce station is the world’s largest operating nuclear plant at 6,550 MW. Our example pairs three stations of that size, 19.65 GW, with 15 GW of continuous AI data-centre demand, leaving additional electricity in the annual balance for the rest of BC.

C$85.2 billion

To build, at Bruce B’s cost

Bruce B cost C$5.994 billion in 1987 for 3,268 MW, about C$4.3 billion per GW in 2025 dollars. Federal support covers 25%; the province finances its 75% ownership share of the rest at 4%, about $1.92 billion a year, included above.

C$8.65 billion

Annual data-centre electricity bills

15 GW running all year uses 131.40 TWh. At BC Hydro’s current transmission rate that is about C$8.65 billion a year. Long-term contracts would be priced to recover the full cost of the stations.

Fewer imports

Firm power in dry years

BC Hydro imported 4,344 GWh (net) in 2025/26 and 8,356 GWh in 2024/25. Firm nuclear output reduces that exposure.

The Bruce B cost is adjusted only for general inflation; a modern build would need a site-specific estimate, and Ontario’s 2025 Darlington reactors cost about C$17.4 billion per GW. Electricity bills are revenue to the power producer, not provincial profit. No data-centre customers have been secured. Explore the nuclear plan

Public power, long-term contracts

Public ownership and First Nations partnership

The three stations would be owned by a BC Power Partnership: the province 75% and First Nations 25%. First Nations equity is backed by the federal Indigenous Loan Guarantee Program, a $10 billion program that in June 2026 backed First Nations’ stake in Ontario’s Darlington nuclear project. Federal support covers 25% of the construction cost; the owners finance the rest in proportion to their stakes. Control stays public and every dollar of profit stays in British Columbia.

Before construction starts, BC signs 20–25 year contracts with data centres and large industry for firm, clean, round-the-clock power. The aim is to support financing, protect ratepayers and establish predictable earnings.

The contract price decides what the stations earn. After operating, fuel and upkeep costs of about C$51 per MWh, contracts averaging about 10.3¢ per kWh earn the $8.0 billion a year in the plan. Recovering the full construction cost over 30 years at 4% alongside operating costs needs about 8.3¢.

What the stations earn each year

All owners combined, net of operating, fuel and upkeep costs, before construction interest. 154.5 TWh sold a year, after the power used for desalination. The province keeps 75%; First Nations partners receive 25%.

Today’s industrial rate, about 6.6¢ per kWh$2.3 billion
Contracts at 8.5¢ per kWh$5.2 billion
Contracts at about 10.3¢ per kWh (the plan)$8.0 billion

Operating, fuel and upkeep costs use the 2025 US nuclear fleet average of US$36.46 per MWh at the Bank of Canada’s 2025 average exchange rate (1.3978). At the plan’s price, the province’s share is $6.0 billion and First Nations partners’ $2.0 billion. The province’s construction interest ($1.92 billion a year) is counted separately in the platform cost.

Cutting waste, funding communities

Efficiency savings and community projects

The framework estimates $3.5 billion a year in savings from reducing duplicate programs and overhead, consolidating services into direct payments, and improving procurement and project management.

BCFundMe costs $200 million a year. Residents post local projects such as potholes, parks and playgrounds, donate, and the province adds 50 cents for every dollar donated. Money is released at milestones and every dollar is tracked in public, so people can see where it goes.

The waste savings alone could pay for BCFundMe more than 17 times over.

A year of savings compared with BCFundMe

Duplicate programs and overhead$1.5 billion
Services consolidated into direct payments$1.0 billion
Procurement and project reform$1.0 billion
Total savings$3.5 billion
BCFundMe matching$0.2 billion
$400 milliondonated by residents
$200 millionprovincial 50% match
$600 millionof local projects a year

Savings are the party’s high estimates and must be additional to the current government’s own savings plan. The proposed donation tax credit would be an extra cost not included here. No separate dollar figure is estimated for corruption; public tracking is the safeguard.

A growing workforce

Working families and provincial revenue

Affordable homes, skilled jobs in energy and data centres, and support for young families are intended to help people build a life in BC. The example below shows the provincial income tax paid by working families.

One working family

Two earners at $65,000 each

Provincial income tax: $3,207 each

$6,415 a year

2026 BC tax brackets less the basic personal credit. Illustrative incomes.

New working familiesProvincial income tax a year
10,000$64 million
50,000$321 million
100,000$641 million

Not added to the totals above; it is one of the additional revenue sources on the path to $500. It counts provincial income tax only; these families would also pay sales and property taxes and help fill job vacancies. They would also use schools and health care, and receive the Dividend once they meet its residency rules.

Assumptions and limitations

What the estimates depend on

Major revenue sources depend on new infrastructure

BC Power earnings and export growth only arrive after reactors and interties are licensed, financed and running. Until then, the formula pays a lower Dividend.

Every dollar is counted once

Nuclear sales appear only in BC Power earnings; the export line is hydro only. Shipbuilding is counted as jobs, not provincial revenue. Existing royalties are already in today’s budget, so only the increase is new money.

Growth is measured, then paid out

Dividend dollars spent in BC should raise tax revenue, but the plan does not count it in advance. When the extra revenue shows up in the public accounts, the formula passes it on.

One Land Value Tax design

A 0.7% provincial levy on land value, not buildings. Municipal property taxes stay with municipalities. The Land Value Tax page uses the same design.

Contracts must cover the full cost

BC Power’s $8.0 billion of earnings needs contracts averaging about 10.3¢ per kWh. Three stations cost about C$85 billion at Bruce B’s cost in today’s dollars, but about C$342 billion at Darlington’s 2025 cost, which would need higher prices or more borrowing.

Today’s deficit is not addressed

BC’s 2026/27 budget already spends $13.3 billion more than it collects. The framework’s new revenue is assigned to new programs, not to that gap.

Phasing

Proposed implementation stages

  1. Years 1–2

    Land Value Tax phased in (0.3%, then 0.5%). PST to 6%. First reactor site selection and licensing. Open Books BC and the efficiency review. The BC Dividend launches for every resident at the amount the formula allows, with child and disability top-ups.

  2. Years 3–4

    Land Value Tax at 0.7%. PST to 5%. First reactors under construction and 20–25 year power contracts signed. Royalty framework modernized. BC Power Wealth Fund opens.

  3. Years 5–7

    First reactors operating. All programs at full implementation. The formula pays about $268 a month per person at the party’s high estimates.

  4. Years 8–10

    Reactor fleet approaching completion. Wealth Fund returns, better contracts and measured savings move the Dividend toward $500.

Adapted from the party’s published framework. Year 1 spending is roughly 30–40% of the full-implementation figures above.

Sources and method

How the balance and the Dividend formula are calculated

New revenue is the sum of the revenue lines at the party’s high estimates: $11.55 + $3.0 + $1.0 + $6.0 + $4.0 + $3.5 billion = $29.05 billion. Every other commitment is the child top-ups’ net cost ($1.56 billion), the nuclear interest ($1.92 billion) and the fixed commitments ($10.75 billion): $14.22 billion.

The Dividend formula: (new revenue − other commitments + $3.5 billion of programs the Dividend replaces) ÷ (5,697,536 residents × 12) = $18.33 billion ÷ 68.4 million = about $268 a month. Its net cost, $14.83 billion, balances the plan exactly.

The path to $500: each lever in C$ billions ÷ 68.4 million person-months. Contracts: 154.48 TWh × $10 per MWh × 75%. Wealth Fund: $3 billion × ((1.05¹⁰ − 1) ÷ 0.05) × 5%. Poverty: 25% of $3.05 billion, the midpoint of the CCPA’s $3.0–3.1 billion in today’s dollars. Families: 100,000 × $6,415.

The disability line is the party’s $0.2 billion of benefits (30,000+ children at $6,000) scaled to $6,500 ($0.22 billion), plus $0.15 billion of supports: $0.37 billion. Host community funds are 154.92 TWh × $1 per MWh: $0.15 billion.

Nuclear interest is capacity × construction cost per GW × the province’s borrowed share × the interest rate: 19.65 GW × C$4.33 billion × 75% (after federal support) × 75% (the province’s ownership stake) × 4% is about $1.92 billion a year. The BC Power earnings line shows the province’s 75% share of the $8.0 billion net earnings: $6.0 billion.

Public-power earnings are energy sold (154.48 TWh: 131.40 to data centres and 23.08 to the grid) × the contract price, less 154.92 TWh generated × US$36.46 per MWh × 1.3978. The price at which all owners together earn $8.0 billion is ($8.0 billion + $7.90 billion) ÷ 154.48 TWh, about $102.89 per MWh. Full-cost recovery adds a 30-year, 4% repayment of C$85.2 billion ($4.92 billion a year): about $82.99 per MWh.

Data-centre electricity bills are 131.40 TWh × 4.914¢ per kWh plus 15,000,000 kVA × $12.178 × 12 months (BC Hydro Rate Schedule 1830), assuming demand in kVA equals kW.

Family income tax applies the 2026 BC brackets (5.6% to $50,363, then 7.7%) to $65,000 and subtracts the basic personal credit ($13,216 × 5.6%). Other credits are ignored.

The Land Value Tax line is total assessed value × land share × capture rate. At $2.75 trillion × 60% × 0.7% it is $11.55 billion.

Sources

Sources reviewed September 2026. Calculations by BC Renewal Party. Party estimates have not been independently verified.